The $16,500 job that quietly became a $6,710 job
You bid 10 retrofit windows at $16,500, collect half up front, order the units, and six weeks later two show up with cracked glass. The manufacturer replaces them free. The second trip isn't free, and nobody codes it anywhere. That's the hole in the window and door installer bookkeeping Texas shops typically run — the books track the job total, when the money is actually made and lost one opening at a time.
Here's how to set it up so the leak shows on a report instead of a hunch.
Before the job: deposits, measure trips, and five cost codes
A deposit on a special-order unit is not revenue. It's a customer deposit — money you owe back in product or cash until the units are installed. Book it as a liability. If you book it as income, your profit looks great in March and terrible in May, and nothing in between is usable.
Set up cost codes — the buckets every dollar on a job gets filed into — before you take the deposit, not after. For window and door work, five carry almost everything: units, freight and delivery, install labor, trim and sealants, and warranty/rework.
That last code is the one most installers skip, and it's the one that explains your year.
Sales tax you pay on units belongs in the units cost code, riding with the material it was charged on. Dumped into a general "taxes" expense account, it disappears from job cost and your margin per opening reads high.
During the install: breakage, change orders, and per-opening math
Use a burdened labor rate — the wage plus payroll taxes, workers' comp, and vehicle cost — not the hourly wage. Say two installers at a burdened $40 an hour run 16 hours on that 10-window job: 32 hours × $40 = $1,280.
Now the full bid as costed:
- Units: 10 × $600 = $6,000
- Freight: $400
- Install labor: $1,280
- Trim, shims, sealant: $320
- Measure trip and warehouse pickup: $200
Total cost: $6,000 + $400 + $1,280 + $320 + $200 = $8,200. Against $16,500, that's $8,300 gross profit — $830 per opening, 50.3%.
Then the two cracked units. The glass itself is warranted, but the supplier won't take back a broken sealed unit or waive handling on a rush replacement — so you buy two more at the same $600 each: 2 × $600 = $1,200, out of your pocket, not the manufacturer's. Add $150 in expedited freight to get them on site. Then a return trip by one installer, 6 hours at the same burdened $40: 6 × $40 = $240. Stack the three: $1,200 + $150 = $1,350, and $1,350 + $240 = $1,590 in damage nobody bid.
New job cost: $8,200 + $1,590 = $9,790. Gross profit: $16,500 − $9,790 = $6,710, or $671 per opening — 40.7%.
Nine and a half points of margin, on one job, from damage nobody coded. Run that across a year of callbacks and you can see why the bank balance never matches the P&L.
Builder work vs. homeowner retail: which one is harder on your books
Retail homeowner work bills simply — deposit, balance on completion — but cash lands lumpy and you're financing special-order units for weeks.
Builder and GC work pays slower and holds retainage: a slice of each invoice, often 5% to 10%, the builder keeps until the whole project closes out. Say a builder holds 10% on your $16,500 — $1,650 sitting in someone else's account for months.
Retainage must be invoiced and tracked as a receivable from day one. Code it to a separate account or it never gets chased.
The tradeoff: retail is easier to account for, builder work is easier to scale. My verdict for a crew under $2M — take the builder work, but only if you're running a WIP schedule, a job-by-job comparison of costs incurred against what you've billed. Without it you'll overbill early (bill more than you've earned in cost), spend the cash, and finish three jobs in the red at once.
Closeout: punch lists, warranty callbacks, and the job nobody closes
A window job isn't done when the last unit is set. It's done after the punch walk, the caulk touch-up, and the sash that sticks in August.
Keep the job open in your books for a defined window after final billing — 60 or 90 days — and code callbacks to it. When you close it early, that service trip lands in overhead and your reported margin lies to you on the next bid.
For storm-related replacement and impact-rated work on the coast, keep documentation attached to the job file: product approval paperwork, inspection sign-offs, and the invoice that matches them. Insurance and builder disputes are won on paperwork, not memory.
Subs and 1099s: Where Texas Window Installer Bookkeeping Breaks in January
Most window and door shops use 1099 install crews for overflow. Say you pay one $900 a week for five weeks — that's $4,500, well past the $600 threshold that triggers a Form 1099-NEC for nonemployee compensation.
Collect the W-9 before the first check clears, not in January. Form 1099-NEC must be furnished to the payee and filed with the IRS by January 31.
If you're paying crews per opening rather than hourly, track the per-opening rate in your cost codes anyway. You need labor cost per opening to bid the next job, and a lump-sum sub check tells you nothing.
Where this gets handled
Stream keeps contractor books current month to month, with job costing and WIP tracking available for crews that need margin by job, not just a year-end total. Payroll you run, AP and AR you approve — we reconcile all of it into books you can actually bid from, and handle retainage, progress billing, change orders, and the Texas franchise tax report.
If windows, siding and glass is your trade, see how we handle bookkeeping and taxes for windows, siding and glass contractors.
Submit a pricing request and we'll scope it against your job volume.
Want the next trade-specific guide when it posts? Subscribe to the newsletter.